Links last verified October 2, 2011
Archived Minutes
Highlights:
Anchor QEA presented its projects under a contract with the Chehalis Flood Authority:
· Fish study (mainstem from upper Chehalis to Porter RM33)
· Enhancement plan (tributaries that drain into mainstem Chehalis in the same area)
HWG Conceptual Projects Committee members were identified and meeting times scheduled at 1:00 following the HWG meetings.