Grays Harbor County Home Page
County Home Page
County Departments Home
Public Services Home Page
Connor Creek Erosion
  Control Project


Reports &
 Summaries

Preliminary Engineering Report Natural Resources Assessment Regulatory Issues Summary

Permitting
JARPA

SEPA

Supplemental
Septics & Wellheads
Wetland Assessment

Imagery
Then & Now
Aerial Photos

Washington State Parks
Download the State Park's Connor Creek Bridge power-point presentation

Download and install your Free Microsoft Power Point Viewer

Download MS's Free Power Point Viewer

 

 

CONNOR CREEK EROSION CONTROL
REPORTS AND SUMMARIES

 

Preliminary Engineering Report

PFD Document
Zip File

    Table of Contents (44k)
        Compision of Alternatives (3.23MB)
        Chapter 1 (103K)
        Chapter 2 (133K)
        Chapter 3 (36K)
            Table 4 (3.23 MB)
        Chapter 4 (5K)

Entire Document

 

Natural Resources Assessment

PFD Document
Zip File
Natural Resource Assessment (65K)
List of Figures  
Figure A. Connor Creek Wetland Delineation (129K jpg) (44K jpg)
 
Appendices  
Wetland Data Sheets
 
A1, A2, A3, A4
 
B1
 
C2, C4
 
D2
 
E
 

 

Regulatory Issues Summary

PFD Document
Zip File

Regulatory Issues Summary (65K)